BUYER QUESTIONSMake the operating scope clear.
Which model is best for a small store?
C3 Mini is the compact starting point, with a 60 cm minimum navigable width and a 50 cm minimum clearance height in the specification table. The complete route still needs an on-site turning and access assessment.
Does C2 Pro need a permanent water connection?
The docking configuration can support automatic water exchange. An optional 30 L / 30 L mobile external tank is described for sites without convenient plumbing. Agree the station and tank scope before ordering.
Can the robot use lifts and access gates?
Elevator and gate integration is a project option, not a universal out-of-box feature. Review equipment interfaces, permissions, connectivity and commissioning requirements for the actual site.
Can a cleaning robot replace all manual cleaning?
Robots can handle planned accessible floor routes. People still manage exceptions, stairs, inaccessible corners, consumables and maintenance. Use a site trial to establish the division of work.
What should a pilot project measure?
Measure cleanable area completed within the agreed shift, missed zones, operator interventions, water and charging stops, and the agreed floor-cleanliness result. Record the mode and site conditions alongside each result.
What comes with a distribution or OEM proposal?
Define the robot version, station and options, spare parts, training, branding scope, destination documentation and service responsibilities. Pricing is supplied privately against the agreed configuration.